National Project: HOUSING AND URBAN ENVIRONMENT

Geographical spread of projects:

Rostov Region, Volgograd Region, Moscow, St. Petersburg and Leningrad Region

Power lines in the city

PJSC Rosseti South

Project Construction of water treatment facilities and water supply distribution grids in Sambek village of the Neklinovsky district in the Rostov Region
Work done The scope of construction: 6.8 km of 10 kV OTL, declared maximum capacity of the object is 194.71 kW
Outcome Completion of the construction of treatment facilities and distribution grids provided water supply to more than 2,000 residents of Sambek village

PJSC Rosseti South

Project Construction of new multi‑apartment residential buildings in the Tractorozavodsky, Dzerzhinsky, Central and Sovetsky districts of the Volgograd Region
Work done

Over 4.4 km of cable lines were routed. A 400 kVA transformer substation was constructed. Eight towers were replaced

Outcome The grid connection of newly erected buildings was completed

PJSC Rosseti Moscow Region

Project Construction of Tsaritsyno‑2 residential complex in Moscow
Work done

Six transformer substations with transformers of various power levels (400, 1,200 and 1,600 kVA) were installed to supply electricity to seven multi‑storey buildings. Four 10 kV cable lines and 144 0.4 kV cable lines with a total length of 24.5 km were routed

Outcome

The overall connected capacity will be 14.75 MW.

The residential complex is provided with power supply under the second category of reliability, and in case of disturbances on one line, the reserve line will be activated for power supply

PJSC Rosseti Lenenergo

Project Connection of new residential complexes to the Company’s power grid
Work done

42 residential complexes in St. Petersburg and the Leningrad Region were connected to the Company’s power grids. Among them are residential complexes Novoye Sertolovo (1.3 MW) and Verevo City (1.1 MW), apart‑hotel VALO (1.6 MW), and UP‑Quarter Pushkinsky (966 kW)

Outcome The connected capacity totalled 28.8 MW