National Project: HOUSING AND URBAN ENVIRONMENT
Rostov Region, Volgograd Region, Moscow, St. Petersburg and Leningrad Region
Project | Construction of water treatment facilities and water supply distribution grids in Sambek village of the Neklinovsky district in the Rostov Region |
Work done | The scope of construction: 6.8 km of 10 kV OTL, declared maximum capacity of the object is 194.71 kW |
Outcome | Completion of the construction of treatment facilities and distribution grids provided water supply to more than 2,000 residents of Sambek village |
Project | Construction of new multi‑apartment residential buildings in the Tractorozavodsky, Dzerzhinsky, Central and Sovetsky districts of the Volgograd Region |
Work done | Over 4.4 km of cable lines were routed. A 400 kVA transformer substation was constructed. Eight towers were replaced |
Outcome | The grid connection of newly erected buildings was completed |
Project | Construction of Tsaritsyno‑2 residential complex in Moscow |
Work done | Six transformer substations with transformers of various power levels (400, 1,200 and 1,600 kVA) were installed to supply electricity to seven multi‑storey buildings. Four 10 kV cable lines and 144 0.4 kV cable lines with a total length of 24.5 km were routed |
Outcome | The overall connected capacity will be 14.75 MW. The residential complex is provided with power supply under the second category of reliability, and in case of disturbances on one line, the reserve line will be activated for power supply |
Project | Connection of new residential complexes to the Company’s power grid |
Work done | 42 residential complexes in St. Petersburg and the Leningrad Region were connected to the Company’s power grids. Among them are residential complexes Novoye Sertolovo (1.3 MW) and Verevo City (1.1 MW), apart‑hotel VALO (1.6 MW), and UP‑Quarter Pushkinsky (966 kW) |
Outcome | The connected capacity totalled 28.8 MW |