National Project: CULTURE

Geographical spread of projects:

St. Petersburg, Republic of Mordovia, Belgorod, Kaluga Region, Nizhny Novgorod Region

JSC Rosseti Yantar

Project Renovation of the Litva bastion in Kaliningrad
Work done 15 kW power required for the object was provided. Scope: construction of 0.4 kV PTL from TP‑869 transformer substation with installation of 0.4 kV switchgear and the establishment of electricity metering system
Outcome The historical location was brought back to life: a tourist route was created along the places where the young Peter the Great used to visit and an exhibition about the history of the fleet

PJSC Rosseti Lenenergo

Project Roschinsky Cultural Leisure Centre in the Vyborgsky district of the Leningrad Region
Work done

240 kW of additional power was allocated to the centre’s training site

Outcome Total connected capacity exceeded 760 kW. The facility is supplied with electric power via 0.4 kV grids. The centre holds various events for residents of the villages of Roshchino, Tsvelodubovo and Pushnoye in the Leningrad Region

PJSC Rosseti South

Project Connection to the Company’s grids of the Bishops’ Chambers with the house church of the Saviour of All Mighty Grace, which are the part of the architectural ensemble of the Astrakhan Kremlin
Work done

Provided power is 150 kW

Outcome The Astrakhan Kremlin is the main attraction of the regional centre. In the course of a full‑scale repair and restoration project, the interior decoration of the chambers was recreated, and the lost dome with a cross covered with gold leaf was installed on the church

PJSC Rosseti South

Project Renovation of the former Pobeda cinema in Volgograd
Work done

A new transformer substation was installed. One of the oldest buildings in the city received 520 kW of additional power

Outcome The walls of the legendary building will house a regional puppet theatre and theatre studios for children. Now, the name of the building is the House of Childhood