National Project:
EDUCATION
Geographical spread of projects:
Republic of Chuvashia, Perm, Belgorod Region, Oryol, Moscow, St. Petersburg
Project | Construction of a general education school in the town of Mariinsky Posad in the Republic of Chuvashia |
Work done | As part of the grid connection, 2,569 m of 10 kV OTL with protected wire and 567 m of 10 kV cable line were constructed, and 10/0.4 kV double‑transformer integrated transformer substation (400 kVA installed capacity of each transformer) was installed |
Outcome | The school can be attended by 329 students, and a new IT class was opened there |
Project | A new educational cluster of the Shvetsov Aviation Technical School in Perm |
Work done | As a part of the grid connection, power engineers completed the following:
|
Outcome | The opportunities of one of the specialised educational institutions were expanded for the development of the domestic engine building industry |
Project | Construction of a school for 1,000 students in the residential area Novosadovy‑41 of the Belgorod district in the Belgorod Region |
Work done | Grid connection was completed. Connected capacity is 1.26 MVA. PTL length is 0.46 km |
Outcome | The school is put into operation. A modern space for obtaining quality knowledge is ready for the educational process |
Project | Digital Transformation Laboratory of the Oryol State Agrarian University named after N.V. Parakhin |
Work done | The laboratory replicated the architecture for the digital power grid region (PGR), the whole complex of distributed automation objects, a pole‑type transformer substation, and the highly automated workplace of a PGR dispatcher |
Outcome | The presented modern equipment of domestic manufacturers allows to train students of the university in technological processes on a practical level and to solve the task of training highly qualified personnel of the Oryol Region |
Project | Power supply to the Pioneers Palace (Vorobyovy Gory in Moscow) |
Work done | Two integrated cubicle transformer substations with 2x1,600 kVA and 2x630 kVA transformers equipped with power metering and teleautomatic covering remote monitoring, metering and control, as well as relay protection, and automatics. Two 10 kV cable lines and 32 0.4 kV cable lines with a total length of more than 11.3 km were routed |
Outcome | The increase in capacity was 2.3 MW. The facility will be provided with power supply under the second category of reliability, and in case of disturbances on one line, the reserve line will be activated for power supply |
Project | Construction of a new school in St. Petersburg |
Work done | The 10/0.4 kV integrated cubicle transformer substation was constructed, 10 and 0.4 kV cable lines were routed, and a smart power metering system was installed |
Outcome | Additional power allocated is 963 kW. The school is designed for 1,100 students: 44 classes of 25 students each |