National Project:
ECOLOGY
Geographical spread of projects:
Krasnodar Territory, Leningrad Region, Smolensk Region, Yaroslavl Region, Kaliningrad Region
Project | Grid connection of solar power plants in the Labinsky district of the Krasnodar Territory |
Work done | Yasnaya 110/10 kV substation was built with installation of one 40 MVA transformer and arrangement of incoming lines of 110 kV OTL |
Outcome | The power plant will generate more than 50 million kWh per year. This is enough to cover the entire power consumption of the Labinsky district, or about 30,000 families |
Project | Construction of charging infrastructure facilities for fast charging of electric vehicles with a capacity of 150 kW and the ability to charge two electric vehicles simultaneously |
Work done | Installation of 6 electric charging stations (ECS) was completed |
Outcome | Now, including new charging stations, the number of ECSs at PJSC Rosseti Lenenergo totals 73, of which 62 are for fast car charging |
Project | Construction of a water treatment plant in the village of Bogoroditskoye, Kozinskoe Rural Settlement, Smolensk district of the Smolensk Region |
Work done | Grid connection of the facility completed. Connected capacity is 0.2 MVA. PTL length is 1.03 km |
Outcome | The project provided the settlement (Bogoroditskoye village) with a centralised water supply system of adequate quality |
Project | Construction of a water treatment plant with a capacity of 1000 cu.m per day in Novy Nekouz settlement, the Yaroslavl Region |
Work done | Grid connection of the facility completed. Connected capacity is 0.5 MVA. PTL length is 1.42 km |
Outcome | The construction of the water treatment plant will improve the quality of drinking water through multi‑stage water treatment, including deferrisation, filtration, and disinfection |
Project | Production facility in the Chernyakhovsk Industrial Park, Kaliningrad Region |
Work done | 28 MW of power was provided |
Outcome | Russia’s largest solar energy equipment manufacturing facility will open in the Chernyakhovsk Industrial Park, producing more than 1 GW of silicon wafers per year. This will double the green energy production in Russia |
Project | Construction of new electric charging stations |
Work done | Installation of 4 fast ECSs (150 kW capacity) was completed |
Outcome | The Company’s operational responsibility zone includes 11 ECSs located in coastal resort towns and in large cities close to the eastern border of the Kaliningrad Region |
Project | Conversion to electric heating of private sector dwellings in Ulan‑Ude as part of the Clean Air federal project |
Work done | Work was started to develop project documentation for the Left Bank zone of Ulan‑Ude, and a suitable type of electric heating equipment was determined. A house was converted to electric heating as a pilot project |
Outcome | Work has started on the project in the Left Bank zone of Ulan‑Ude, including a pilot project on the Left Bank, which includes three dacha condominiums with 1,852 households. This will reduce the environmental impact and improve the ecological conditions, including the amount of pollutant emissions into the atmosphere |