Project | Multifunctional sports centre in St. Petersburg |
Work done | For reliable power supply to the facility, the Company’s specialists routed 0.4 kV cable lines and installed a power metering system |
Outcome | 500 kW of power was provided. The power supply source is Zavod Libknekhta 110 kV substation |
Project | Construction of the Zarechny Residential Centre for the Elderly and Disabled in the Republic of Mordovia |
Work done | Construction of 10 kV OTL with protected wire (3.64 km), 10 kV cable line (0.64 km) was completed; 10/0.38 kV double‑transformer integrated transformer substation (1,000 kVA installed capacity of each transformer) was installed, and 0.38 kV cable line (0.2 km) was built |
Outcome | The facility was connected to the grid |
Project | Construction of the Siren (Lilac) Centre for Rhythmic Gymnastics, Trampolining and Sports Acrobatics in Belgorod |
Work done | Power supply grids, including 14 cable lines (0.4 kV) with total length of 2,045 m, 12 cable lines (6 kV) with total length of 2,326 m, were rearranged; TP‑48 transformer substation was dismantled/reinstalled |
Outcome | The sports centre is up and running, and expected to host major regional competitions |
Project | Aquatoria Sports and Fitness Centre in Balabanov, Kaluga Region |
Work done | Grid connection was completed. Connected capacity is 0.32 MVA. PTL length is 0.52 km |
Outcome | The first municipal swimming pool was built in the Borovsky district of the Kaluga Region. The new sports complex has two pools (10 m and 25 m); water access for low‑mobility visitors is provided |
Project | Novoslobodsky Residential Centre for the Elderly and Disabled in the Duminichsky district of the Kaluga Region |
Work done | Grid connection was completed. The volume of connected capacity is 0.5 MVA. PTL length is 1.1 km |
Outcome | The capacity of the institution was expanded and living conditions for the elderly and disabled were improved |
Project | Construction of an indoor football arena at the Borsky sports complex in the Nizhny Novgorod Region |
Work done | Grid connection completed. Connected capacity is 1.26 MVA. PTL length is 1.66 km |